A scenic shot of the 2nd bridge over Mahanadi river. The 2.1 km long Second Mahanadi Rail Bridge built at a cost of Rs. 120 crore was commissioned in 2008. The bridge has been designed for a train speed of 160 km per hour. Adequate steps have been taken to withstand earthquake. The early morning Saga reflects as the rising sun rays falls on each of the span.