31162-WAG9-LGD --- Rudranil RoyChowdhuryframed this Lallaguda G9, along with its Gomoh counterpart, waiting at Burdwan outer with fully loaded BCNA rakes on 1st Feb 2014. This is the only G9 loco with an operational speed of 120 km/h for 6000 tonne load.